Our locker rooms are about to get a major upgrade.

We’re excited to announce that new locker rooms are coming to the J! Construction started September 1, with the goal to reopen no later than November 30. Here’s what you can expect from our new locker rooms:

1. New, Z-shaped, lockers (!!!!)

 

Say goodbye to the battery-powered lockers we’ve all come to loathe! Our new Z-shaped lockers will have a manual keypad, room for your bag, and extra space dedicated to hanging your clothes—meaning no more wrinkled shirts, pants, or dresses!

2. New restroom fixtures

Both locker rooms will be upgraded with new sensor based toilets and faucets. Not only will these upgrades modernize our locker rooms, they’re also more sanitary and more energy efficient, meaning they’ll save the J money in the long run.

3. New showers and wet area

All of the showers will be completely redone— expect to see new tiles, flooring, shower heads, and doors.

4. Remodeled schvitz and steam room 

Now you can sweat in style. The men’s schvitz and steam room, and the women’s steam room, will both be upgraded with new seating—plus, the steam rooms will get a new steam generator for a more consistent steaming experience.

5. Remodeled hot tubs

New tiling and upgraded fixtures will bring our hot tubs to the next level and reduce the amount of closures.

6. New, redesigned lounges

Both the men’s and women’s locker rooms will receive brand new furniture, carpeting, paint, and new flat-screen HD TVs. We’ll see you in the lounge!

7. Two brand-new massage rooms

Out with the old, in with the new—we’re completely removing our old massage rooms and rebuilding them in a new location, closer to the entry way of the locker rooms. The new massage rooms will be bigger, more modern, and much more relaxing with new lighting and furniture.

AthleteSpotlight NancyAltermanAthlete Spotlight: Nancy Alterman
MaccabiThe Magic of the 2017 Maccabi Games